INSTALLATION INSTRUCTIONS
【Architectural Engineering】
Reserve transportation channels and door openings of the equipment room according to the equipment dimensions. During installation, the equipment can be placed against the wall on one side. The distance between the operating side and the wall shall be greater than 800mm, the distance between the other two sides and the wall shall not be less than 500mm, and a 600mm maintenance space shall be reserved between the top of the equipment and the ceiling.
【Structural Engineering】
The floor slab shall meet the load-bearing capacity requirements of the equipment.
【Water Supply and Drainage Engineering】
Provide connections for the piping system such as water inlet, water outlet, ventilation, and emptying of the equipment. Reserve cleaning faucets and drain floor drains for the equipment.
【Electrical Engineering】
Reserve a three-phase five-wire power supply matching the equipment power, as well as power supplies for lighting and ventilation.
【HVAC Engineering】
Reserve a ventilation system in the equipment room, with an air change rate of not less than 15 times/h.